Mr. R.P. Dhiman

Chairman-Cum-Managing Director

The CMD of the company had experience of about 35(thirty- five) years in Civil construction activities being registered Government Class-A Civil Contractor, who had completed various Civil Projects in Government Sectors/ Corporate Sectors, Boards and Private sector. In addition to above he had sufficient experience in Mechanical side especially in Heavy earth Moving machineries which is being used in Construction activities of Hydro Project sector.


 

PREVIOUS SET-UP BIODATA:

Name                             : – R. P. Dhiman, Govt. Contractor Class “A”  (At present) Chairman-cum-Managing Director,  Snowdew Hydroelectric Power Projects Pvt. Ltd.,  Dhanotu, P.O.Mahadev, Tehsil Sunder Nagar, Distt. Mandi (HP)

 Permanent Address   : – R/O Dhanotu, P.O.Mahadev Tehsil Sunder Nagar Distt. Mandi (HP)

 Registration No.         : -Registered Class-A Contractor, as per Engineer-in-Chief, H.P.PWD., Shimla-I, Letter No.PW-CTR-32-2-1/95-Vol-II-17285-384, dated 22-08-1995, latest renewal is  upto 31-03-2022, as per Chief Engineer (SZ) HPPWD, Shimla, letter No.PW-CTR-32-2(2)/2016-17-5856-5955 Dated 09-05-2017 Enlistment No. now allotted is ‘HP-SZ-R(A)-189

TIN NO: 02090700014

GST of Company: 02AASCS6891G

PAN NO: AASCS6891G

TAN NO.PTLS20824G

EPF CODE NO: PN/SM/HP-8249

EXPLOSIVE LICENCE: E/NC/HP/22/408(E63205)

LABOUR LICENCE:  LO/CBA/CLA/P/02/2014

 


 

WORK EXPERIENCE:-

The following major projects completed and handed over to the Department/organizations:

 

 Sr.No. Name of Work                                                                                   
1

a}  Kiunr Hydro Power Project of Civil & Mechanical works  Such as construction of roads leading of project site, construction of Magazin road for Magazine, approaches to different sites such as power house, site office, labour huts etc. Retaining Walls /Breast walls, (HRT) underground tunnel work, adit, Complete Weir Site, (HRT) tunnel work, water conductor, Foreway, Anchor Block, Penstock, Power House, Transmission line  with materials, Side by side the work of HRT complete within  all respects.

b) Electro Mechanical Machineries Andrits.

2 Reprofiling of Sutlej river bed excavation and plunge pool excavation (dredging)Downstream of Nathpa Dam from RD58.263m to 533.263m at Nathpa and restoration of approach road to SFT outfall Structure RD 1100m silt Flushing cut and over at  Nathpa and other works i/c. Hiring  of machineries etc
3.

HRT and power house Construction work in Rs. 168.44

Thirot Hydrel project in distt

4. Wear site and Power House Construction work in Thirot hydel project in distt.
5. HRT and open channel excavation work in Gaz Hydel project in Distt- kangra
6 Underground HRT and power house Excavation at Largi HPSEB (Hydel Project Work) and works as sub – contractor og main gency.
7 HRT, Road and Metalling and Tarring work of Malana Power Co. Limited Distt – Kullu
8 C/o civil work for river diversion at intake, HRT and convenience channel excavation Work and hiring of machines etc. of HCC Ltd. At recong Peo Distt. Kinnaur at Kashang Hydro Electric Project.
9 C/O Naglari  To Sarachi road
10 C/O Goshani to Pekhri Road
11 C/O Mohatta Bagshair road
12 C/O Ropru Jammu Gujrudhar Road
13 C/O Ranabag Kashaigad
14 C/O Khora – Age to Bhallan road
15 C/O Shilli to Karana road
16 C/O Brow to Poshna road.
17 C/O Railla Khanog road Addu Moharidhar Nagalni
18 C/O Narahan to Sarahan and Ruhani to Monala Road
19 C/O Link road from soidhar to beungal
20 C/O Nagujhar to Mashna Thach Road
21 C/O Farbog to Thach Road