.Mr. R.P. Dhiman
Chairman-Cum-Managing Director
The CMD of the company had experience of about 35(thirty- five) years in Civil construction activities being registered Government Class-A Civil Contractor, who had completed various Civil Projects in Government Sectors/ Corporate Sectors, Boards and Private sector. In addition to above he had sufficient experience in Mechanical side especially in Heavy earth Moving machineries which is being used in Construction activities of Hydro Project sector.
PREVIOUS SET-UP BIODATA:
Name : – R. P. Dhiman, Govt. Contractor Class “A” (At present) Chairman-cum-Managing Director, Snowdew Hydroelectric Power Projects Pvt. Ltd., Dhanotu, P.O.Mahadev, Tehsil Sunder Nagar, Distt. Mandi (HP)
Permanent Address : – R/O Dhanotu, P.O.Mahadev Tehsil Sunder Nagar Distt. Mandi (HP)
Registration No. : -Registered Class-A Contractor, as per Engineer-in-Chief, H.P.PWD., Shimla-I, Letter No.PW-CTR-32-2-1/95-Vol-II-17285-384, dated 22-08-1995, latest renewal is upto 31-03-2022, as per Chief Engineer (SZ) HPPWD, Shimla, letter No.PW-CTR-32-2(2)/2016-17-5856-5955 Dated 09-05-2017 Enlistment No. now allotted is ‘HP-SZ-R(A)-189
TIN NO: 02090700014
GST of Company: 02AASCS6891G
PAN NO: AASCS6891G
TAN NO.PTLS20824G
EPF CODE NO: PN/SM/HP-8249
EXPLOSIVE LICENCE: E/NC/HP/22/408(
LABOUR LICENCE: LO/CBA/CLA/P/02/2014
WORK EXPERIENCE:-
The following major projects completed and handed over to the Department/organizations:
Sr.No. | Name of Work |
1 |
a} Kiunr Hydro Power Project of Civil & Mechanical works Such as construction of roads leading of project site, construction of Magazin road for Magazine, approaches to different sites such as power house, site office, labour huts etc. Retaining Walls /Breast walls, (HRT) underground tunnel work, adit, Complete Weir Site, (HRT) tunnel work, water conductor, Foreway, Anchor Block, Penstock, Power House, Transmission line with materials, Side by side the work of HRT complete within all respects.
b) Electro Mechanical Machineries Andrits. |
2 | Reprofiling of Sutlej river bed excavation and plunge pool excavation (dredging)Downstream of Nathpa Dam from RD58.263m to 533.263m at Nathpa and restoration of approach road to SFT outfall Structure RD 1100m silt Flushing cut and over at Nathpa and other works i/c. Hiring of machineries etc |
3. |
HRT and power house Construction work in Rs. 168.44 Thirot Hydrel project in distt |
4. | Wear site and Power House Construction work in Thirot hydel project in distt. |
5. | HRT and open channel excavation work in Gaz Hydel project in Distt- kangra |
6 | Underground HRT and power house Excavation at Largi HPSEB (Hydel Project Work) and works as sub – contractor og main gency. |
7 | HRT, Road and Metalling and Tarring work of Malana Power Co. Limited Distt – Kullu |
8 | C/o civil work for river diversion at intake, HRT and convenience channel excavation Work and hiring of machines etc. of HCC Ltd. At recong Peo Distt. Kinnaur at Kashang Hydro Electric Project. |
9 | C/O Naglari To Sarachi road |
10 | C/O Goshani to Pekhri Road |
11 | C/O Mohatta Bagshair road |
12 | C/O Ropru Jammu Gujrudhar Road |
13 | C/O Ranabag Kashaigad |
14 | C/O Khora – Age to Bhallan road |
15 | C/O Shilli to Karana road |
16 | C/O Brow to Poshna road. |
17 | C/O Railla Khanog road Addu Moharidhar Nagalni |
18 | C/O Narahan to Sarahan and Ruhani to Monala Road |
19 | C/O Link road from soidhar to beungal |
20 | C/O Nagujhar to Mashna Thach Road |
21 | C/O Farbog to Thach Road |