CONSTRUCTION & CONSULTANCY SERVICES
Snowdew HPPPL Consultancy Service provides hydro power design & system layout. We can help you with your the hydroelectric design and consultancy services including, engineering, project planning, project management, hydraulic design and electro-mechanical equipment, Power transmission lines and electrical substations etc.
Our team can provide hydropower engineering, civil, structural and mechanical design, feasibility studies, site investigations, Preparation of DPR, cost estimates, contract documents, bid evaluations, environmental impact assessments and reports, project management, project planning and on-site inspections.
Work Experience-:
- We have the work experience of construction of Kiunr Hydro Power project 5.00 MW at village Kiunr District Chamba H.P. all Civil & Mechanical work such as construction of roads leading to project site , construction of magazine, road for magazine, approaches to different sites such as power house site, office, labour huts etc. Retaining walls, Breast walls,(HRT) underground tunnel works, adit, Complete weir site, water conductor, Foreway, anchor block, Penstock, Power House Transmission line with materials.
- Electro Mechanical Machineries.
- Construction of traffic tunnel KM 0/0 to 2/874 at Aut under HPSEB Division Larji, District Mandi
- Reprofiling of Sainj river bed excavation and plumge pool exaction (dredging) Downstream of Nathpa Dam from RD 58.263m to 533.263m at Nathpa and Restoration of approach road to SFT Outfall structure RD 1100 M SILT Flushing cut and cover at Nathpa.
- C/o civil work for River diversion at intake HRT and convenience channel excavation work
- Road works and Metalling and tarring work of Malana Hydro Power Project Co.Limited Distt. Kullu. (C/o road from Power House to weir site)
- Under ground HRT and Power House Excavation at Larji HPSEB (Hydel Project Work) and works as sub contractor of main agency.
Hydro Projects in Hand with their status
Completed projects
- Kiunr Hydro Project 5.00 mw
- Dunali Hydro Project 5.00 mw
Projects Under Survey and Investigation
- New Himadri Project 2.5 mw
- Holi Top Hydro Project 5.00 mw
- Lumbadug SHEP 5.00 mw
Projects Under Construction
- Small Hydro Project Niharni 5.00 mw
- Lower Holi Project 2.00 mw
Please feel free to contact with us for any kind of query/conversation related to hydro power projects / electromechanical / civil work .
Please contact with us .
(Director)
Er. Sidhant Dhiman – 9805200777
Er. Yadvinder – 94180-68077,
Er. Sandeep Thakur – 94597-64533
Recognized World Wide for its third party services, SNOWDEW HYDROELECTRIC POWER PROJECTS PVT. LTD., brings together a multi-disciplinary team of experts in all disciplines required in order to cover every aspect of your Hydro Power Project Value Chain, from Feasibility and Assistance in the Design Phase to Commissioning and Operations.
Hydro Power Plant Feasibility & Design Assistance
SNOWDEW HYDROELECTRIC POWER PROJECTS PVT. LTD., ensure the success of your hydro project with our experts and advanced techniques team.
Procurement Services for Hydro Power Projects
SNOWDEW HYDROELECTRIC POWER PROJECTS PVT. LTD., has the resources to ensure your equipment’s quality no matter the location of manufacturing.
Staff of Kiunr Hydro Project
SNOWDEW HYDROELECTRIC POWER PROJECTS PVT. LTD., have a complete Team of Engineer and Works. In Our Team we have Civil Engineer, Mechanical Engineer and Electrical Engineer.
Trench Weir KHP at Chamba
We are TRUE to WORDS
Development of New Hydro Power Facilities, a Strong and Continuing Trend, Results in the Addition of Substantial New Electric Generating Capacity Around the World Every Year.